VEGA KS ( 1/2/3) KVA MANUAL
13
four EBPS may be connected to the UPS.Connect black to black,. Press the
connector tightly together to ensure a properconnection.
To connect a second EBP, unclip the EBP connector onthe first EBP and pull gently to
extend the wiring to the EBPconnector on the second EBP. Repeat for any additional
EBPs.
f)
Verify that the EBP connections are tight and the adequate bendradius and strain
relief exist for each cable.
Figure10Typical EBPInstallation
g)
Replace the EBP front cover.
To replace the cover, verify that the EBP cables are routed throughthe EBP cover
knockouts, cover connects with the cover hook near the left side of theEBP cabinet.
Repeat for each additional EBP.
It is the same with the installation of the front cover. (Refer”to install the UPS”)
h)
Verify that all wires connected between the UPS and EBP(s) are installedbehind
the front covers and not accessible to users.
i)
Return to Step4 to continue the UPS installation.
l
Rackmountconverted to Tower Installation
(1)Rackmountconverted to Tower plasticbase installation
① Two plastic base brackets
② Flatten it after intercrossing
Intercross as following Figure: