background image

13

FILTER ASSEMBLY

1

2

3

KEY

PART NO.

DESCRIPTION

UNIT

1

CFAO-375

COALESCING FILTER ASSEMBLY 3/8

1

2

CFEO-375

COALESCING FILTER ELEMENT 3/8

1

3

CFBP-375

COALESCING FILTER BOWL

1

Summary of Contents for ACL2S1

Page 1: ...rgyle Ave Fresno CA 93727 559 291 1650 800 428 7139 FAX 559 348 9677 TECH WEST INC Manufacturers of Dental Vacuum and Air Systems ULTRA CLEAN LUBRICATED COMPRESSOR INSTALLATION AND SERVICE MANUAL Revi...

Page 2: ......

Page 3: ...and Changing the Oil 7 Figure 4 Replacing Oil Indicator Lens 7 Parts Breakdown 8 11 Dessicant Dryer Parts Breakdown 12 Coalescing Filter Parts Breakdown 13 Single Ultra Clean Lubricated Compressor Ass...

Page 4: ...Maintenance Service Notes 2...

Page 5: ...een these values Circuit breaker switches must be 20 30 amp depending on model and voltage necessary 2 Local code may require you to provide one quick disconnect safety switch for the compressor 3 See...

Page 6: ...b Remove the Lubricated Compressor from its shipping skid Inspect the unit for damage Lubricated Compressors are shipped bolted to a pallet This pallet is intended for shipping only and should be dis...

Page 7: ...ATION 2 3 CONNECTIONS Electrical Connection to disconnect and electrical panel 220 v 110 v 220 v on the single models only Air Out Connection to building supply line Alternate Air Connection to fresh...

Page 8: ...or life and efficiency f Replace the moisture indicator on the compressor part MI 100 6 ULTRA CLEAN LUBRICATED COMPRESSOR INSTALLATION 4 START UP STEPS a Make sure the shut off valve from the compress...

Page 9: ...through oil filler spout Do not overfill Keep filled to level as shown below Oil should be changed annually or when oil becomes discolored Check oil level with compressor off and compressor sitting le...

Page 10: ...ELAND COMPRESSOR HEAD 1HP 1 2 CCH 230 230 V COPELAND COMPRESSOR HEAD 1 HP 1 3 CF 115 115 V COOLING FAN 1 4 CF 230 230 V COOLING FAN 1 5 CFS 100 COMPRESSOR FAN SHROUD 1 6 CFG 100 FINGER GUARD 1 7 OSG 1...

Page 11: ...A 230 230 V ONLY CAP AND RELAY ASSEMBLY COMPLETE 1 4 PR 115 115 V POTENTIAL RELAY 1 5 PR 208 208 230 V ONLY POTENTIAL RELAY 1 6 RCC 115 115 V RUN CAPACITOR 1 7 RCC 208 208 230 V RUN CAPACITOR 1 8 RCC...

Page 12: ...G 250 COMPRESSOR GAUGE 1 2 BV 250 1 4 BALL VALVE 1 3 MI 100 MOISTURE INDICATOR 1 4 FA 4 4 1 4 FLARE HOSE FITTING 1 5 BN 250 CL 1 4 BRASS CLOSE NIPPLE 1 6 BT 250 1 4 BRASS TEE 1 7 BSE 250 1 4 BRASS ELB...

Page 13: ...CK VALVE MALE TO FEMALE CONNECTION 1 2 CPT 100 COMPRESSOR PURGE TANK 1 3 CV 375D 100 3 8 CHECK VALVE 1 3 4 HA 12 250 1 4 HOSE ASSEMBLY 12 LONG 1 5 DPC 1 DRYER PRE COOLER SINGLE COMPRESSOR 1 6 DPC 2 DR...

Page 14: ...V 250 METERING VALVE 1 6 SN 250 CL STAINLESS STEEL NIPPLE 1 4 3 7 FE 4 6 FLAIR FITTING 1 4 X 3 8 1 8 BV 250 BALL VALVE 1 4 1 9 BT 250 BRASS TEE 1 4 2 10 PFH 375 CLEAR DRAIN HOSE PER FOOT 11 MSD 100 MO...

Page 15: ...13 FILTER ASSEMBLY 1 2 3 KEY PART NO DESCRIPTION UNIT 1 CFAO 375 COALESCING FILTER ASSEMBLY 3 8 1 2 CFEO 375 COALESCING FILTER ELEMENT 3 8 1 3 CFBP 375 COALESCING FILTER BOWL 1...

Page 16: ...T 500 POLY FLO TUBE 1 2 PER FT 7 CFAO 375 COALESCING FILTER 3 8 1 9 DPB 100 DRYER PURGE BUCKET 1 10 CPT 100 COMPRESSOR PURGE TANK 1 11 RDC 100 REPLACEMENT DESICCANT CARTRIDGE 1 12 DSV 115 1 4 CHECK VA...

Page 17: ...ALESCING FILTER 3 8 1 9 DPB 100 DRYER PURGE BUCKET 1 10 CPT 100 COMPRESSOR PURGE TANK 1 11 RDC 100 REPLACEMENT DESICCANT CARTRIDGE 1 12 CV 375D 100 3 8 CHECK VALVE 2 13 DSV 230 PURGE VALVE SOLENOID VA...

Page 18: ...LESCING FILTER 3 8 1 9 DPB 100 DRYER PURGE BUCKET 1 10 CPT 100 COMPRESSOR PURGE TANK 1 11 RDC 100 REPLACEMENT DESICCANT CARTRIDGE 1 12 CV 375D 100 3 8 CHECK VALVE 3 13 DSV 230 PURGE VALVE SOLENOID VAL...

Page 19: ...17 Figure 5 Compressor Wiring Diagram...

Page 20: ...s YES NO YES YES Replace intake filter Contact Tech West YES Does unloader valve system function properly YES Does com pressor run too hot or too frequent 1 Locate and repair leaks 2 Ventilate if room...

Page 21: ...or does start capacitor feel hot NO YES Is there continuity across terminal 2 5 or potential relay NOTE 1 Tape relay box If starts relay is bad 2 Check for continuity across 2 5 Replace if none Wiring...

Page 22: ...t Tech West YES Is there a blockage in the air lines YES Locate and repair Note Close shut off valve Pump up tank to 100 psi If pres sure is main tained for 15 20 min leak is in office lines Run unit...

Page 23: ...or does start capacitor feel hot NO YES Is there continuity across terminal 2 5 or potential relay NOTE 1 Tape relay box If starts relay is bad 2 Check for continuity across 2 5 Replace if none Wiring...

Page 24: ...n the air lines YES Locate and repair Note Close shut off valve Pump up tank to 100 psi If pres sure is main tained for 15 20 min leak is in office lines Run unit in manual purge mode for one week If...

Page 25: ...r does start capacitor feel hot NO YES Is there continuity across terminal 2 5 or potential relay NOTE 1 Tape relay box If starts relay is bad 2 Check for continuity across 2 5 Replace if none Wiring...

Page 26: ...24 Maintenance Service Notes...

Page 27: ...25 Maintenance Service Notes...

Page 28: ...2625 N Argyle Ave Fresno CA 93727 559 291 1650 800 428 7139 FAX 559 348 9677 TECH WEST INC Manufacturers of Dental Vacuum and Air Systems...

Reviews: