Technalogix Ltd
.
VIII-1
Section VIII - Installation
This section contains installation recommendations, unpacking, inspection, and installation instructions
for the power amplifier. We are sure that you are chomping at the bit to install your new system, so we
recommend that you read the following sections very carefully.
Building Recommendations
The quality of the building is of great importance if you are to expect long life and continued
performance from the power amplifier. The building must be clean, dry, temperature controlled and
secure. Don’t forget to allow space in the building for any additional racks to house test equipment, a
workbench area, line regulating transformers, ladders, equipment and parts storage, first aid kit,
emergency generator if used, as well as heating and cooling devices that may be unique to your
installation. A sloping roof will tend to develop leaks less rapidly. The building should be well roofed
with good material. The cooling load will be lowered with reflective or light colored roofing material.
Summary of Contents for TAUD-40
Page 1: ...TAUD 40 POWER AMPLIFIER NEW ADVENTURES IN BROADCASTING Technalogix...
Page 17: ......
Page 18: ......