www.technimount.com
BP25 and 25-HD UG 202111-01
17
Return To Table of Contents
1. The Bracket Pro Serie 25 and Bracket Pro Serie
25-HD are designed to be installed on the ZOLL X
Series Monitor/Defibrillator.
2. Start by removing the 2 blocks located on the
bottom of the ZOLL X Series Monitor/Defibrillator.
3. Remove both blocks with a Philips Screwdriver
and store them as they will not be used for the
installation of th
e Bracket Pro Serie 25 or Brack Pro
Serie 25-HD.
Installation Guide
INSTALLATION OF THE BRACKET ONTO ZOLL X SERIES MONITOR/DEFIBRILLATOR