20
BP25 and 25-HD UG 202111-01
www.technimount.com
INSTALLATION OF THE BRACKET ONTO THE LIFEPAK 15 MONITOR/DEFIBRILLATOR
(CONTINUED)
Installation Guide
13. Ensure the blocks are placed according to
the left or right of the ZOLL X Series Monitor/
Defibrillator.
14. Once the blocks are installed, the ZOLL X
Series Monitor/Defibrillator can be installed
onto the Bracket Pro Serie 25 or Bracket Pro
Serie 25-HD.
15.
Place the ZOLL X Series Monitor/Defibrillator
onto the bracket.
16. Locate the two (2) Stainless Steel Socket Head
Screws 10-32 x 3/4 in that were removed from
the bracket earlier.