www.techsys.com.au
Version 1.3 11/12/11
34
C o r p o r a t io n
JOCKEY PUMP
JOCKEY PUMP
Jockey Pump
selection ----Off----
----Off----, ===On===
*JP Cut In Level
250
0 - 9999
*JP Cut Out Level
400
0 - 9999
*JP Run On Time
seconds
2
0 - 999
"JP In Delay Time
seconds
0
0 - 999
The Jockey pump is typically a smaller auxiliary pump that is outside the flow range of the
main pumps. The jockey pump will turn on when there are no main pumps on and the
level is below Jockey Cut In Level. If the jockey pump is enabled it automatically takes
over Output relay 4 for its operation, therefore making the system capable of 1 Jockey
pump plus 6 main pumps.
To enable the jockey pump and allow viewing of the
rest of the jockey pumps screens change to Jockey
Pump ON.
JP Cut In Level
The JP Cut In Level is the Level at which the pump
defined as Jockey pump will restart.
JP Cut Out Level
The Level Point is the system that the Jockey Pump
will be turned off.
JP Run On Time
The Jockey pump can be forced to run on after the
main system has started by the time detailed in this
screen.
JP In Delay
When the system level reaches the JP Cut In
Level and remains there the Jockey pump will start
after this period. Given that no main pumps have
started.
NOTE: IF THE JOCKEY
PUMP IS TURNED “ON”, RELAY 4 IS NO LONGER
AVAILABLE FOR ANY OTHER FUNCTION.
JP Cut Out Level
XXXX
JP Run On Time
XXX seconds
JP Restart Delay
XXX seconds
JP Cut In Level
XXXX
Jockey Pump
------------Off------------
Jockey Pump
=======On======