2
VERY IMPORTANT
Before installation or carrying out any maintenance task, disconnect the power cable from the
CPU (230 Vac).
The system must be installed by qualified people, in accordance with all local and national
electrical regulations.
Check that the power supply voltage corresponds to which is indicated on the label located on
the side.
Be sure the electrical connections are firm in order to avoid false contacts, resulting in
over-heating.
Do not connect the network power supply cable before having made all power supply
connections to the electrolysis cell.
Choose an installation site where the system will be easy to access and enable easy viewing
of the CPU and the electrode.
TECHNICAL SPECIFICATIONS:
DIMENSIONS:
CPU SPECIFICATIONS:
CONTROL
MICROPROCESSOR
POWER SUPPLY
230 V ac/50-60Hz/H50RR-F-3G (3 x 1 mm
2
)
OUTPUT
7,5V dc, 15A (MamNet Eco 15) / 6,8V dc 20A (MamNet
Eco 20) / 6,3V dc 30A (MamNet Eco30) / 7V dc 45A
(Mamnet Eco 45) max.
RV-K-1000V 2x6mm² cable electrodo
CABLE FOR TEMPE
WATER DETECTOR
3x1 mm
2
H05VV-F-3G1
SELF-CLEANING
AUTOMATIC PROGRAMMABLE POLARITY CHANGE
FUSIBLE
2A (MAMNET ECO 15, 20) / 3,15A (MAMNET ECO30, 45)
REFRIGERATION
CONVECTION/FORCED
Summary of Contents for MAMNET ECO 15
Page 1: ...MANUAL MAMNET ECO 15 20 30 45 ...
Page 22: ...21 Max submergible limit ...
Page 24: ...23 ...
Page 26: ...25 ...
Page 29: ...28 NOTES ...
Page 30: ...29 ...
Page 31: ...30 ...
Page 32: ...31 ...