a. Machine's installation
In order to avoid any problems and to achieve the best performances from the machine we strongly
suggest to check the surface where the machine will be located. Check that the ground is solid
(concrete floors or other hard material floor are strongly suggested), otherwise take care to reinforce
the points of contact with the footholds of the machine. Check that the soil has a good flatness and
follow the installation procedures:
1.
Position on a plane surface the central foot of the
machine
2.
Assemble the columns
3.
Assemble the crosspiece
4.
Assemble the arch
Place two spacers under the arch extremity to maintain a
perfect parallelism of the arch with the ground.
5.
Assemble the pipe’s roller
Check that roller is in a flat position, you can act on the
appropriate regulations you can adjust the flatness
6.
Connect the hydraulic hoses of the machine to the
couplers under the handwheel adjusting the arch down
stroke
Warning: concerning the above steps, the screw must be not too tighten in view to let the
settlement of the various components of the machine