I.T.S. Ital Trade Services srl ST 1200 Operating Manual
8
7.
Connect the cable to the power supply, taking care that the two black wires and the
brown one are the phases, the blue wires is the Neutral and the yellow – green is the
ground (Warning: the differential switch
connected to the power supply main switch could
grant a sensitivity of 300Ma)
8.
Connect the power supply cable keeping care that the two black wires and the brown
wire are the phases and the yellow green wire is the ground
9.
Switch on the machine by means of acting the main switch
10.
Push the Reset push button
11.
Push the Reset button
12.
By acting on the selectors “Clamp locked” and “Clamp unlocked” , if the engine turn
but the clamp is not moving it’s necessary invert the two phases on the control board
power cable in order to change the engine rotation
13.
By acting on the selectors “Arch Up Stroke” lift the saw arch
14.
After making different movement with the arch in view to settle the machine, tighten all
the screws
15.
Mount the blade
Unwind the blade (using protecting gloves, keeping care to
avoid any contact with sharp side of the blade) remove the
protecting plates of the arch and position the blade
respecting the direction indicated by the stickers.
Apply the correct tension to the idler pulley.
Manually rotate the main pulley for at least 20 revolutions
checking the tension and that the blade is inside the guide
After checking that there is any person close to the machine, start the engine of the blade
at the minimum speed and check that the blade is running properly.
To better understand this operation check out the chapter e – Blade replacement.
Execute some complete movements with the locking clamp to flush out the air.
The installation of the saw machine 0214 0191 will be done by our technicians. Therefore
the instructions contained in this manual must to be considered as approximate
instructions
.