13
INSTALLATION
VERIFICATION
Once the machine has been connected to the main, have to be checked:
1.
Supply pressure:
6-8 bar for full power
2.
The pressure gauge reading can drop 0,5 maximum 1,5 bar when the
motor is started (if a drop greater than 2 bar is noticed, this means that
the supply flow rate is not sufficient).
3.
Make sure, by checking the sight glass (8b, page 10) that when the
machine is in operation two to three drops per minute are fed. The
regulation is carried out by means of the control knob. (7b, page 10).
4. Arm
balance:
By turning the regulation handwheel (11 and 14, page.4) and (4 and 6,
page.6) to the right (-) or to the left (+) different weight at the arm end
are balanced.