6
User’s manual
- TECO 22 - 23 - 25 - 27 Special
UNPACKING/ASSEMBLY
WARNING
Take utmost care when unpacking, assembling, hoisting and installing the machine as described
in this heading.
Keep the original packing in good conditions to be used if the equipment has to be shipped in the
future and make sure that the machine has not suffered damage in transit.
Failure to comply with these instruction may damage the machine and risk the operator’s safety.
Remove the upper part of the packing.
Proceed with the following operations:
- Remove the tower (hori vertical arms) from their position on the pallet.
- Fit the tower into the threaded holes.
- Fasten the tower on the machine’s body with the screw; do not forget to interpose the not ched
washers wihch allow the electric continuity of the machine.
- Assemble the bead breaker with the proper pin and fasten it with the locknut until there is a slight
resistance in the rotation of the bead breaker.
- Connect the tank union to the air connection pipeline provided, securing it with a band clamp.
Fix the air tank to the machine (fig.1a).(T.I. version only).
HOISTING/HANDLING
To remove the machine from the pallet :
Lift the machine sideways enough to insert the forks of the fork-lift truck between the machine and
the pallet as showed in fig.2.
At this point is possible to release the working arm removing the cord which binds the arm to the
turntable.This hoisting point must be used whenever you need to change the installation position of
the machine. Do not attempt to move the machine until it has been disconnected from the electricity
and compressed air supply systems.
2
®
3
800
800
700
®