The following drawing explains how a Blast Chiller cycle can be done.
Insert probe
Room Probe
11.3.1 First phase: “Hard chill”.
It is normally used to fast chill hot foods. E.g. from 80°C / 170°F to 20°C / 70°F
During “
Hard Chill
”, both compressor and fan are always on until the
rS1
temperature is reached. At this
point compressor is turned on end off so as to keep the temperature of the room at the
rS1
value. “Hard
Chill” ends when the temperature measured by the 3 insert probes reach the
iS1
value.
11.3.2 Second phase: “Soft chill”.
The
Soft Chill
starts when the Hard Chill ends. It is used to prevent thin layer of ice from forming on the
product. The Soft Chill lasts until the temperature measured by the 3 insert probes reach the set point
iS2
(usually 4 or 5°C).
During Soft Chill the temperature of the room is regulated by the ambient probe with the set point
rS2
(normally at 0 or 1 °C / 32 or 34°F). When the box temperature reaches the
rS2
value compressor is
turned on end off so as to keep the temperature of the box at this value.
11.3.3 Third phase: “Freezing cycle”.
Freezing Cycle: used to fast freeze foods.
The Freezing Cycle starts when the Soft Chill ends. During the “Freezing Cycle” both compressor and
fan are always on until the
rS3
temperature is reached. At this point compressor and fans are turned on
end off so as to keep the temperature of the room at the
rS3
value (normally some degrees below
iS3)
.
Freezing Cycle ends when the temperature measured by the 3 insert probes reach the
iS3
value
(normally -18°C / 0°F), in any case it ends when the maximum time
Pd1 + Pd2 + Pd3
has expired.
11.3.4 End of the Blast Chill cycle and starting of the Hold Mode.
When one of the three insert probes reaches the iS3 value the values End followed by the i1P or i2P or
i3P are shown on the display.
Cycle ends when all the probes have reached the iS3 value. A signal is generated: buzzer and alarm
relay is turned ON, the display shows the message “End” alternating with the room temperature.
The alarm automatically stops after the “
but
” time or by pressing any keys.
At the end of the cycle the controller can start the “Hold mode” keeping the room temperature at the
value set in HdS parameter.
If HdS = OFF, the machine is turned OFF.
NOTE1:
with
dbH = yES
a defrost is done before the holding phase.
Temper.
°C
FIRST PHASE:
HARD CHILL
2 PHASE
SOFT CHILL
3 PHASE
FREEZING CYCLE
20
15
iS1
10
5
iS2
rS2
0
rS1
-5
-10
Time
-15
iS3
-20
-25
rS3
-30
11.3 EXAMPLE OF A BLAST CHILLER CYCLE
Summary of Contents for BLC10
Page 1: ...BLAST CHILLER FREEZER User Manual PT SL 49 61 EN FR IT ES 3 13 25 37...
Page 2: ...2...
Page 9: ...9 QUICK GUIDE For the daily use...
Page 13: ...REFROIDISSEURS CONG LATEURS RAPIDES Manuel d utilisation PT SL 49 61 FR IT ES 13 25 37...
Page 14: ...14...
Page 21: ...21 GUIDE RAPIDE Guide rapide quotidien...
Page 25: ...ABBATTITORI CONGELATORI Manuale d uso PT SL 49 61 IT ES 25 37...
Page 26: ...26...
Page 33: ...33 33 GUIDA RAPIDA Guida pratica quotidiana...
Page 37: ...ABATIDORES CONGELADORES Manual del usuario PT SL 49 61 ES 37...
Page 38: ...38...
Page 45: ...45 GU A R PIDA Gu a r pida diaria...
Page 49: ...PT SL 49 61 ABATEDORES DE TEMPERATURA CONGELADORES Manual do utilizador...
Page 50: ...50...
Page 57: ...57 GUIA R PIDO Guia r pido di rio...
Page 61: ...SL 61 HLADILNIK ZAMRZOVALNIKA ZA HITRO HLAJENJE ZAMRZOVANJE Navodila za uporabo...
Page 62: ...62...
Page 69: ...69 HITRI VODNIK Za dnevno uporabo...
Page 73: ...1592006207 XB570L GB r1 1 26 08 2015 XB570L 2 20 XB590L XB570L...
Page 94: ...1593006207 XB570L FR r1 0 26 08 2015 XB570L 2 24 XB590L XB570L...
Page 118: ...1591006207 XB570L IT r1 1 26 08 2015 XB570L 2 24 XB590L XB570L...
Page 141: ...1591006207 XB570L IT r1 1 26 08 2015 XB570L 25 24...
Page 142: ...1594006207 XB570L SP r1 0 26 08 2015 XB570L 2 20 XB590L XB570L...
Page 162: ...XB590L XB570L...
Page 177: ...1592006207 XB570L GB r1 1 26 08 2015 XB570L 16 20 3 12 2 MONTAGEM...
Page 184: ...1592006207 XB570L GB r1 1 26 08 2015 XB570L 2 20 XB590L XB570L...