STEP 10
Complete the array with all its component
strings, installing a FLAT-5XL half tile in
alternate rows. Follow the same installation
steps and complete the fixings and
connections following steps 1, 2, 3, 4, 5, 6,
7, 8 and 9, finishing on the left side of the roof
with a FLAT-5XL tile and edge piece (step 6),
installing a FLAT-5XL half tile in alternate rows
(step 9).
STEP 11
Connect the installation to the inverter and ensure
that the connections in parallel are correctly
executed.
STEP 12
Finally, complete the roof with the installation of
FLAT-5XL ceramic tiles and their complementary
special pieces on the left side of the roof.
And finish off the roof with ceramic tiles and pieces.
27