14-IT
TOOLS AND MATERIALS
Personal protective equipment (ppe)
BEFORE STARTING
PREPARING THE SITE
3
3
4
5
• Rule§Pencil§Spirit level§Sealer§Square§Cutter§Belts§Woodworking tools and materials§Rags§Wooden
spacers
• Observe all local hydraulic and construction regulations.§The following instructions are for qualified per-
sonnel with sufficient technical know-how and experience to handle the product in total safety.§This is a
bathtub and must only be used for this purpose. Improper use of the tub shall relieve the producer from
all liability and invalidate the warranty.§Unpack the tub and inspect it for damage. Put the tub back in
its pack until it is required for installation.§Before installing the tub, check access to the final hydraulic
connections.§Check the type of connection and assembly for the tap.§Do not install the tap over the
overflow.
• Make sure the floor and the platform (if mounted) offer a support of at least 800 kg (approximately 1800 lb)
under the tub. Make sure the floor and supporting surface are flat and even.§This tub can be installed on the
floor or on a raised or recessed platform.§If the tub is placed on the floor, drill a hole of the size indicated in
the figure below; the trap must be suitably positioned bearing in mind the dimensions of the tub (see Fig. 2).
• Safety goggles
The tub must be installed by at least two people.
Damage risk�
Do not lift the tub using its edge.
N�B�:
CAUTION:
i
Fig. 2
Dimensions in centimetres and inches
min
� 65 (26’
’)
min
� 25 (10’
’)
30 (12’
’)
40 (16’
’)
12 (5’
’)
Summary of Contents for ALAIOR T5511002160
Page 2: ......
Page 3: ...ITALIANO 5 ENGLISH 11 FRAN AIS 17 ESPA OL 23 DEUTSCH 29...
Page 4: ......
Page 6: ...6 IT...
Page 12: ...12 IT...
Page 18: ...18 IT...
Page 24: ...24 IT...
Page 30: ...30 IT...
Page 35: ......