IT-15
• Remove the tub from its pack and dispose of the latter according to local by-laws.§Place the tub in its
installation position and keep it clear from the floor using wooden blocks.§Install the drain kit on the tub
as shown in Fig. 3, following the instructions of the manufacturer of the drain kit.
• Connect the trap to the plug surround as per the drain kit manufacturer’s instructions.§Open the hot and
cold water taps and check all the connections for leaks.§Fill the tub with water and check the drain con-
nections for leaks.§Fill the tub to the overflow and check for leaks.§Remove the wooden blocks and apply
silicone around the base of the tub.
Risk of injury�
Risk of damage�
Taps mounted on the edge of the tub that can inadvertently be used as a means of support are not appro-
priate or safe for this operation.
Make sure gaskets are applied to all the drain connections.
CAUTION:
CAUTION:
Fig.3
PREPARING THE TUB
INSTALLING THE PIPING
6
7
Summary of Contents for ALAIOR T5511002160
Page 2: ......
Page 3: ...ITALIANO 5 ENGLISH 11 FRAN AIS 17 ESPA OL 23 DEUTSCH 29...
Page 4: ......
Page 6: ...6 IT...
Page 12: ...12 IT...
Page 18: ...18 IT...
Page 24: ...24 IT...
Page 30: ...30 IT...
Page 35: ......