å
Carefully stand your unit upright.
å
Push four DOOR STOPS (4I) into the holes in
the UPRIGHTS (E and F).
å
Push the RUBBER SLEEVES (2R) over the METAL PINS (1R).
Insert the METAL PINS into the holes in the ENDS (A, B, C
and D) and UPRIGHTS (E and F). These are used for door
stops when the DOORS are open.
Step 15
Page 19
4I
4I
E
F
2R
1R
A
B
C
D
(8 used)