INSTALLATION MANUAL PICCOLO
23
pipe diameter [mm]
tightening torque [Nm]
6,35
15 - 18
9,52
31 - 35
12,70
50 - 55
15,88
60 - 65
19,05
70 - 75
A.
B.
10.14 END OF INSTALLATION CHECKS
10.15 START OF CONDENSING
A few simple checks ensure correct system operation:
- Check the electrical connections.
- In multi-split models perform testing before evaporating
with one on and then the next (this will highlight any incorrect
connections to the ventilation units)
- Ensure the proper flow of water into the drain used
Before applying voltage to the condensing unit to ensure that:
- Both fixed properly and stable (if mounted on brackets
between the machine and check that the bracket are tight
rubber vibration dampers).
- The electrical connections, including the earth, are carried
out in accordance with national laws.
- The refrigerant connections are sealed (check all
connections).
- Check the operating pressure (high pressure) by means of
the manifold to verify the correct operation of the pressure
valve
- The PICCOLO system is leak tight and not leaking.
- The power supply voltage does not differ from the plate
value in addition to ± 10%.
- The refrigerant valves are open.
- The PICCOLO valves are open.
INSTALLATION
55
Summary of Contents for PIC-12C6
Page 2: ......
Page 4: ......
Page 5: ...I T A L I A N O ...
Page 6: ......
Page 32: ......
Page 33: ...E N G L I S H ...
Page 34: ......
Page 60: ......
Page 61: ...F R A N Ç A I S ...
Page 62: ......
Page 88: ......
Page 89: ......
Page 90: ......
Page 91: ......