Hook side
Battery Strap Installation:
1. Fit straps loosely
2. Position on chassis
3. Proceed to step P-2
TKR1343
TKR1343
TKR1341
TKR1343
TKR1322
TKR1524
TKR5211X
Thread
Lock
Motor (not included)
TKR40007K
TKR5010
TKR1322
M3x8mm Flat Head Screw
X5
TKR1341
M4x6mm Flat Head Screw
X6
TKR1343
M4x10mm Flat Head Screw
X5
TKR1228
M4 Countersunk Washer
X2
Logo side
Thread
Lock
Thread
Lock
TKR1524
M3x12mm Cap Head Screw
x2
TKR1346
M4x15mm Flat Head Screw
X2
TKR1346
TKR1228
TKR1346
TKR1228
Thread
Lock
Bag P
Final Assembly
21
Note: Install MOD1
pinion 15t-25t
(TKR4175-4185)
at this step.
Adjust gear mesh
and tighten screws
(TKR1346) well.
*Use thread lock.
Step
P-2
Step
P-3
Step
P-4
Step
P-5
Step
P-1
Summary of Contents for EB48.4
Page 1: ......
Page 26: ......
Page 27: ......
Page 28: ...Tekno RC 10755 Scripps Poway Pkwy 598 San Diego CA 92131 USA ...