Performance Verification
32
P5205 Instruction Manual
6.
Set the generator to 100 MHz and check for
≥
4.2 divisions peak
to peak.
7.
Disconnect the setup.
DC CMRR
1.
Set the attenuation of the probe to 50X.
2.
Set the oscilloscope input coupling to DC, the vertical to
50 mV/div, and the sec/div to 200
s. Center the trace on the
display.
3.
Ground the negative terminal of the calibrator with the sliding
ground spade on the calibrator.
4.
Attach the plunger clamps on the differential probe input leads.
5.
Twist the input leads together as shown in Figure 3 on page 13,
and connect both probe inputs to the positive terminal of the
calibrator.
6.
Adjust the offset on the probe output to zero.
7.
Set the output of the calibrator to 500 VDC.
8.
Enable the output.
9.
Check that the trace on the oscilloscope shifts less than 3.33
divisions (167 mV) from center.
10.
Disable the calibrator output and disconnect all test equipment.
This completes the performance verification procedure.
Summary of Contents for P5205
Page 1: ...Instruction Manual P5205 High Voltage Differential Probe 070 9472 01 www tektronix com ...
Page 4: ......
Page 14: ...Getting Started 2 P5205 Instruction Manual ON Figure 1 High Voltage Differential Probe ...
Page 20: ...Getting Started 8 P5205 Instruction Manual ...
Page 38: ...Maintenance 26 P5205 Instruction Manual ...
Page 40: ......
Page 54: ...Replaceable Parts 40 P5205 Instruction Manual ...