GW-483S Installation Guide
Rev. B
Before You Install
Before you begin the installation:
1.
Please review the packing list.
2.
Familiarize yourself with the equipment and unit (see pictures below).
Packing List
The packing list depends on the ordered GW-483S model, but can include some or all of the
following items:
•
GW-483S Cabinet
•
A VoIP Gateway Board assembly with 2 position Terminal Bridge.
•
Two 2-Screw Terminal Bridge assemblies.
•
RF Video Converter unit (optional, as ordered)
•
Power Supply kit. (optional, as ordered)
•
Console cable.
Pictures and Drawings
The following figures depict different views of the GW-483S system.
Introduction
9