51
Installing the 7800 N+1 Patch Panel
6.3
Grounding the Equipment Chassis
As a standard safety practice, the chassis of 7800 N+1 patch panel must be properly grounded to
protect against any contact with an electrical fault condition. It is recommended that the chassis be
connected to earth ground. When the 7800 N+1 patch panel is installed in an equipment rack, connect
the ground wire between the ground lug of the patch panel and the equipment rack ground bar.
Guidelines
•
Use 10 AWG (minimum) stranded ground wire.
•
Terminate equipment side of ground wire with a #10 ring terminal.
•
Keep the length of the ground wire as short as possible.
•
Do NOT daisy chain the ground between equipment. Use a ground bus bar.
•
Do not over tighten ground lug connections.
To connect to the 7800 N+1 Patch Panel to ground:
1.
Connect one end of a ground wire to the ground lug of the 7800 N+1 Patch Panel. See
figure
6.2
on
page
51.
2.
Connect the other end of the ground wire to a ground bar of the equipment rack.If the 7800 N+1
Patch Panel is not installed in an equipment rack, connect the ground wire to earth ground.
3.
Verify that the resistance of the ground path is less than 0.5 ohms.
Figure
6.2
Chassis Ground Connection
Earth
Ground
Ground Bar
Network
Gateway
1
3
5
7
9
11
13
0
2
4
6
8
10
12
14
N+1