Dual-Feed 600A Load Center Frame
600CB10 & 600CB12 Installation Guide
11
© Telect, Inc. All rights reserved. 7.14.17 136429-2
509.926.6000 :: www.telect.com
23. With the output loads (devices fed by this load center) disabled, re-enable fuses or breakers at primary distribution
unit or battery.
24. If applicable, switch circuit breakers ON and then check voltage and polarity
at loads
.
Figure 11 – Installing Circuit Breakers
Figure 12 – Installing Fuse Holders and Fuses