Page 32
Telect, Inc. • USA +1.509.926.6000 • 52.33.3836.37.52
www.telect.com • © 2011 Telect, Inc., All Rights Reserved, 139249-1 A0
The bolts provided are for 2-hole lugs (1/4 - 20 screws, 3/4” C-C). See the following figure for
the location of the studs.
Figure 34 - Grounding Points for Frame
3. Unless stated otherwise by operating company practices and guidelines, connect the MGB to
the site's halo ground. To ground the enclosure frame, follow your corporate grounding prac-
tices or GR 1275.
The 10-position MGB holds 5/8" CC, 1/4-20 studs for use with 1/2"-wide lugs.
This procedure is complete.
Grounding points
Front of enclosure
.75
.625