Getting Started
Teledyne API – Model T300/T300M CO Analyzer
38
3.3.
CONNECTIONS AND SETUP
This section presents the electrical (Section 3.3.1) and pneumatic (Section 3.3.2)
connections for setup and preparing for instrument operation
3.3.1.
ELECTRICAL CONNECTIONS
Note
To maintain compliance with EMC standards, it is required that the cable
length be no greater than 3 meters for all I/O connections, which include
Analog In, Analog Out, Status Out, Control In, Ethernet/LAN, USB, RS-232,
and RS-485.
3.3.1.1.
CONNECTING POWER
Attach the power cord to the analyzer and plug it into a power outlet capable of carrying
at least 10 A current at your AC voltage and that it is equipped with a functioning earth
ground.
WARNING
E
LECTRICAL
S
HOCK
H
AZARD
High Voltages are present inside the analyzer’s case.
Power connection must have functioning ground connection.
Do not defeat the ground wire on power plug.
Turn off analyzer power before disconnecting or connecting electrical
subassemblies.
Do not operate with cover off.
CAUTION
G
ENERAL
S
AFETY
H
AZARD
To avoid damage to your analyzer, make sure that the AC power voltage matches
the voltage indicated on the analyzer’s model/specs label (See Figure 3-4) before
plugging the T300/T300M into line power.
06864D DCN7562
Summary of Contents for T300
Page 2: ......
Page 182: ...06864D DCN7562 ...
Page 227: ...225 This page intentionally left blank 06864D DCN7562 ...
Page 228: ...06864D DCN7562 ...