2 – Installation
DPN 402197 Issue 7.1
© Teledyne Limited
2- 1
2 Installation
To gain the best performance out of the HydroPACT 350 system you must take care when you install
and connect it. This section includes the necessary information to help you identify suitable locations
for the various components of the system, and install and prepare the systems for use.
There are many different types and size of survey vessel and ROV, therefore the instructions in this
chapter represent a set of general guidelines and recommendations that experience has proved
effective.
2.1 Unpacking and Inspection
NOTE
Retain the original transit cases so that you may use them if you must transport
the 350 system for any reason. You will invalidate the warranty if you use improper
packing during transportation.
Upon receipt of the 350 system, check all items against the shipping documents. Perform a careful
visual examination of all sub-assemblies and inspect them for any damage that might have occurred
during transportation.
Notify Teledyne Limited immediately if there are parts or sub-assemblies missing from your shipment. If
you see any damage to the system, file a claim with the insurers and inform Teledyne Limited. The
cover of this manual lists the contact details for Teledyne Limited. Teledyne Limited also operates a
24-hour emergency telephone support line managed by trained and experienced technicians.
To avoid loss or damage to any components of the System, store all sub-assemblies safely in their
transit cases until you need to install them. Obey the environmental limits for storage listed in
for all sub-assemblies.
2.1.1 Scope of Supply
Case 1: 350 Subsea Electronics Case
❐
1 x Electronics pod
❐
1 x PSU to ROV cable (3m)
❐
1 x Universal detection support kit
❐
2 x Triaxial cables (5m)
❐
2 x USB drive (one containing user manuals and declaration of conformity, one containing
DeepView software)
Case 2: 350 Coil Array Case
❐
7 x Coil assemblies
❐
2 x Mounting blocks
❐
8 x Coil clamps