2 – Installation
DPN 402197 Issue 7.1
© Teledyne Limited
2- 11
❐
It will be able to operate in the Forward Search mode. In this mode, the system can estimate
the range to a target that lies along an intersecting course ahead of the ROV.
2.2.4 Installation Checklist
❐
Mount the coil triads in the correct orientation and in the correct place on board the ROV.
Ensure the coil array is central on the ROV.
❐
Protect the coil array from collision damage by mounting it approximately one metre above the
lowest point on the ROV.
❐
Make certain there is at least 0.5 metres clearance between the coils and the ROV body.
❐
Do not allow any free movement in the coil triads, the SEP, the altimeter or the cables.
❐
Always use the nylon mounting block when you install the SEP.
❐
When you select a location to install the altimeter, consider its minimum range measurement
specification.
❐
Avoid installing your altimeter where there is a significant horizontal offset distance between it
and the coil array. Make certain there is less than 1.0 metres vertical offset between the altim-
eter and the coil array.
2.3 Electrical Installation
WARNING
There is a risk of death or serious injury by electric shock when you work on the
electrical distribution system of the ROV. Only a competent engineer who has the
relevant training and experience must make any connections to the ROV electrical
distribution system.
Power-off the ROV and isolate the mains electrical supply before you connect the
350 system to the electrical distribution system. Observe all relevant local and
national safety regulations while you work on the ROV and on the 350 system.
Do not reconnect the mains electrical supply to the ROV or to the 350 system until
you have completed all work and you have fitted all safety covers and ground
connections.
NOTE
The 350 system is supplied configured for RS232 communications as standard.
Installations running a SDC10 topside computer also support 2 and 4-wire current
loop communication. This can be configured by setting links within the SEP and a
switch on the SDC comms module. The SEP will need to be configured before
mounting it onto the ROV.