2 – Installation
DPN 402197 Issue 7.1
© Teledyne Limited
2- 3
❐
Locate the SEP housing so that you may install the cables easily between the sub-assemblies
of the 350 system.
❐
Do not apply sharp bends or other mechanical stresses to the cables during installation or
operation. Route the cables between the components of the sub-sea installation, and use plas-
tic clips to secure them to the ROV frame.
❐
On small ROVs, position the SEP close to the centre of buoyancy to avoid upsetting the ROV
trim.
❐
Tighten the mounting straps firmly so that the SEP housing cannot move under the influence of
ROV vibration or currents in the water.
Figure 2-1: SEP mounting arrangement
2.2.2 Coil Array
CAUTION
The coils contain no user-serviceable parts. Do not open them.
When choosing a location for the coil array consider the following:
❐
All vertical range measurements to the target position are relative to the coil reference line.
This line, shown in
, joins the centres of the port and the starboard lateral coils.
❐
Measurements of lateral offset are relative to the centre of the coil array and are positive if the
target is to starboard and negative if it is to port.