Routine Testing
The CP shall be tested weekly as specified in the next paragraph.
The system should be fully tested at least twice a year, or as required by national and/or
local fire codes. All devices, system wiring and component functions should be tested
and maintained. These inspections should be performed in addition to the routine
maintenance activities such as cleaning the detectors (which should be performed in
accordance with Telefire’s instructions).
Perform a Field Test of each zone.
Maintenance and test actions shall be conducted by a company or service technician
authorized by Telefire.
Records of all inspection and maintenance activities should be kept.
i
Note
Testing shall be performed by authorized service personnel that are
employed by authorized companies.
20.1
Weekly Inspection – To Be Performed By Site Personnel
The site's delegated worker should inspect the control panel weekly and verify that the
ECD is in the quiescent state, as detailed below:
•
The green Power LED is ON with short OFF pulses.
•
None of the yellow or red LEDs are on or blinking
•
The control panel's fault buzzer does not sound
•
Perform a Light Test to verify that all LEDs are functioning.
Call your service company if any of these conditions is not met