2-1-1
U29PHSMEN
STANDARD MAINTENANCE
Service Schedule of Components
This maintenance chart shows you the standard of replacement and cleaning time for each part.
Because those may replace depending on environment and purpose for use, use the chart for reference.
Notes:
1.Clean all parts for the tape transport (Upper Drum with Video Head / Pinch Roller / ACE Head / FE Head) using
90% lsopropyl Alcohol.
2.After cleaning the parts, do all DECK ADJUSTMENTS.
3.For the reference numbers listed above, refer to Deck Exploded Views.
* B73 ------ Recording model only
* B86 ------ Not used in 2 head model.
h: Hours
: Cleaning
I
: Replace
Deck
Periodic Service Schedule
Ref.No.
Part Name
1,000 h
2,000 h
3,000 h
4,000 h
B2
Cylinder Assembly
I
I
B3
Loading Motor Assembly
I
B8
Pulley Assembly
I
I
B587
Tension Lever Assembly
I
I
B31
ACE Head Assembly
I
B573, B574
Reel S, Reel T
I
B37
Capstan Motor
I
I
B52
Cap Belt
I
I
*B73
FE Head
I
*B86
F Brake Assembly (HI)
I
I
B133
Idler Assembly (HI)
I
I
B410
Pinch Arm Assembly
I
I
B414
M Brake (SP) Assembly (HI)
I
I
B416
M Brake (TU) Assembly (HI)
I
I
B525
LDG Belt
I
I