Transportation of the packed machine
(floor models)

The packing has been projected to assure at the machine the highest protection.

It is therefore suggested to transport the machine while it is packed as near as possible
at the place where it will be installed.

To carry the packed machine, use an elevator, or a bench trolley, inserting its forks in
the basement’s holes.

4.2

Unpacking

Unpack the machine and carefully check it. In case of doubt, do not use it, and call the
Seller.

Bench top models:

-

cut holding straps, open box from the top, remove protection packaging material
and remove machine from the box.

Floor models:

-

cut the straps and remove the cardboard box from the top;

T

HE

 

OPENING

 

OF

 

THE

 

LATERAL

 

PANEL

 

IS

 

ONLY

 

ALLOWED

TO

 

THE

  A

SSISTANCE

  S

ERVICE

 

OR

 

TO

 

QUALIFIED

TECHNICIANS

 

AND

 

MUST

 

BE

 

MADE

 

BEFORE

 

CONNECTING

IT

. M

AKE

 

SURE

 

NOT

 

TO

 

DAMAGE

 

THE

 

INTERNAL

 

PARTS

 

OF

THE

 

MACHINE

.

-

Remove both the lateral panels unscrewing the relevant fixing screws [21];

-

Find and unscrew the bolts [22] which fix the machine’s frame at the packing’s basement;

The outlet of the supply cable is placed on the machine’s lower side. During the lifting make sure
not to damage it.

-

Lift the machine from the basement, possibly working on the lower side, near the wheels, and however, only on the
frame’s carrying parts. Remove the basement, and lean the machine on the floor avoiding bumps;

DO NOT insert objects, ropes or brackets for the lifting THROUGH the machine, since these
could damage the inside parts.

-

Re-close the lateral panels;

-

Replace or move the packing, which is produced with entirely recyclable materials (

).

Summary of Contents for GEL 20

Page 1: ...Z15 013 0198 V02 ING GEL OPERATING INSTRUCTIONS GEL 20 Ice cream freezer...

Page 2: ...English Ice cream freezer 2...

Page 3: ...AUTIONS 4 2 SAFETY DEVICES 5 2 1 Lid s magnetic sensor 5 2 2 Extraction door s grill 5 3 TECHNICAL DATA 6 3 1 Technical data plate and EC marking 6 3 2 Acoustic pressure level 6 4 CARRYING AND UNPACKI...

Page 4: ...OLES OR DRAIN HOLES DO NOT REMOVE OR HIDE FOR ANY REASON ANY LABEL APPLIED ON THE MACHINE NEVER OPEN THE PROTECTING PANELS THE MACHINE DOES NOT CONTAIN IN ITS INSIDE PARTS WHICH CAN BE OPERATED BY THE...

Page 5: ...en the lid is open In consequence the device can t operate when the lid is open and if it is opened during its functioning the beater immediately stops In any case the lid s magnetic sensor MUST NOT b...

Page 6: ...Technical Data section This data has been measured at 1 meter from the surface of the machine and at 1 60 meters from ground level during the machine s functioning 4 CARRYING AND UNPACKING Note We su...

Page 7: ...op THE OPENING OF THE LATERAL PANEL IS ONLY ALLOWED TO THE ASSISTANCE SERVICE OR TO QUALIFIED TECHNICIANS AND MUST BE MADE BEFORE CONNECTING IT MAKE SURE NOT TO DAMAGE THE INTERNAL PARTS OF THE MACHIN...

Page 8: ...g items are all included in the package lid 5 beater 6 correctly fixed inside the cylinder with its knob 7 and supplied with adjustable blades 31 1 3 according to the model drain plug 4 not in large s...

Page 9: ...rked with appropriate letters phase R or phases R S T neutral N earth the earth pole must be properly recognizable the electrical socket must prevent through appropriate mechanical measures the plug s...

Page 10: ...E BY TURNING THE BEATER S SWITCH 24 BEFORE INTRODUCING YOUR HANDS OR ANY OBJECT INSIDE THE REFRIGERATING CYLINDER Open the lid unscrew the fixing knob 7 pull out the beater 6 from the cylinder then cl...

Page 11: ...ded NOT RESPECTING THESE RULES IN ADDITION TO VOIDING ANY FORM OF WARRANTY CAN SERIOUSLY COMPROMISE THE SAFETY PERFORMANCES AND FUNCTIONING OF THE SAME MACHINE 6 2 Controls and indicators Note Those c...

Page 12: ...oroughly cleaned and sanitized see Section 7 Note if more than one consecutive production cycle is required a rinse between cycles is sufficient ref Par 7 1 alternatively start with light coloured mix...

Page 13: ...eater s Switch 24 to BEATING right wait for completion of cycle which is when Timer knob 32 is again on starting position and the alarm rings when available turn Beater s Switch 24 to STOP centre At t...

Page 14: ...ON OF THE PRODUCTION CYCLE S TO THOROUGHLY DISASSEMBLE WASH AND SANITIZE ANY PARTS OF THE MACHINE WHICH COME INTO CONTACT WITH THE PRODUCT 7 WASHING AND SANITIZING 7 1 Rinse only To remove ice cream r...

Page 15: ...emove lid 5 if necessary remove hinge pin 25 remove drain plug 4 unscrew counterclockwise fixing knob 7 and remove beater 6 RESIDUAL HAZARD BEATER S BLADE ARE SHARP ALONG BOTTOM AND EXTERNAL SIDE EDGE...

Page 16: ...c controls 7 4 Reassembly THESE OPERATIONS MUST BE CARRIED OUT ONLY AFTER DISCONNECTING MACHINE FROM MAIN POWER Assemble blades 31 on beater s supports 6 partially screwing screws 36 Blades will be su...

Page 17: ...venly 7 6 Sanitization Sanitization is an operation similar to rinsing ref Par 7 1 However this must to be carried out with a solution of warm water and food compatible disinfectant To correctly dose...

Page 18: ...res Section contained in the Technical Handbook 8 2 Check of safety devices Every three months check that all safety devices on your machine are in perfect working order open the lid and remove the be...

Page 19: ...ifesavers on the electric plant are closed If they aren t before closing them make sure that no one is making electrical maintenance Cause A protective fuse of the electric plant is cut down Find and...

Page 20: ...eat or frequently repeat call the assistance service Refrigerating system or control circuit are faulty Call Assistance Service Cause Obstacles are placed at the air conditioning s opening at a distan...

Page 21: ...English Operating instructions 21...

Page 22: ...d eventual travelling expenses will be at purchasers charge Freon gas filling is excluded from the warranty The warranty declines if the machine is used not in conformity with the sales instructions i...