INSTALLATION
3.Installation
The touchscreen can be installed very easily. The only tool required is a Phillips screwdriver.
Installation into a new furnace or to upgrade a furnace from the old display panel is very
similar, but for clarity the two procedures are divided into the following two sections.
3.1 Installation into a new furnace
To install the touchscreen into a new furnace, ensure that the DPC is fitted.
1. Turn the tube switch off.
2. Connect the DPC and power cable to the TOUCHSCREEN (Figure 3-1).
3. Use the four screws to secure the touchscreen in its position. It is now installed and
ready to be tested.
Test if the screen is operating, switch the tube power on. The Main Menu should appear on
the screen. The touchscreen is now ready for use.
3.2 Upgrading the front panel display
The Front Panel Display is an old user interface with a keypad and a one line display. There is
one Front Panel Display for each Digital Controller (DPC and DTC). The size and the shape
of the new touchscreen are incompatible with the Front Panel Display and new mounting
location is required.
To replace the Front Panel Display with a touchscreen, the following steps are necessary:
1. Turn the tube switch off.
2. Remove the screws that hold the DPC Front Panel Display and disconnect all the cables.
3. Remove the Front Panel Display.
4. Repeat these steps for the DTC Front Panel Display.
5. Install the new processor boards in the DPC and the DTC.
NOTE
Make sure that important data from the DPC and the DTC are backed up
before replacing the processor boards. All data will be lost upon
disconnecting the processor board.
6. Install the new touchscreen power supply.
7. Make new mounting location for the touchscreen.
8. Connect the flat cable to TOUCHSCREEN.
T
OUCHSCREEN
R
EFERENCE MANUAL
3-1