5.6 PRESSURE SWITCH SERVICE
A.
The unit is protected from low pressure operations by a
pressure switch (figure 5.6A). This switch is mounted at
the bottom of the electrical cabinet.
B.
The switch will close and consent the control circuit
when sufficient water supply pressure is presented. The
switch is factory set to 20 psi.
C.
If insufficient water supply pressure is present, the
switch will open and prevent operations.
D.
In cases where sufficient water supply pressure is
present as indicated by the unit’s pressure gauges and the pump is “off”, and if the
pressure switch fails to close, the pressure switch may be defective. To replace the
pressure switch, follow the steps outlined:
1.
Shut down unit operations according to
section 3.4
in this manual. Be certain
proper lock-out procedures are followed. Also, be certain system pressure is
eliminated and the unit’s pressure gauges read “0” pressure.
2.
Drain unit by removing the pump casing drain plug.
3.
A capillary runs from the cooling cylinder to the pressure switch. Remove the
capillary connection.
4.
The brass elbow mounted on the pressure switch must be removed.
5.
Remove the electrical connections to the pressure switch.
6.
The pressure switch is mounted onto the electrical cabinet with two 1/2” nuts in
series. Remove the nuts to remove the pressure switch. A new pressure switch
from the factory should be installed by continuing with
step 7
.
7.
Thread one 1/2” nut onto the pressure switch and then place the pressure switch
through the panel in the original mounting hole. Thread the second 1/2” nut from
the bottom of the pressure switch. Tighten to lock the pressure switch in place.
8.
Install the brass elbow fitting. Teflon tape and leak preventative paste should be
used to prevent water leakage. Install the capillary tube and resume operations.
Pressure switch
Figure 5.6A
Summary of Contents for Veteran VT LXG Series
Page 2: ......
Page 6: ...Page 6 THIS PAGE INTENTIONALLY BLANK ...
Page 20: ...Page 20 THIS PAGE INTENTIONALLY BLANK ...
Page 42: ...Page 42 THIS PAGE INTENTIONALLY BLANK ...
Page 48: ...Page 48 THIS PAGE INTENTIONALLY BLANK ...
Page 68: ...Page 68 THIS PAGE INTENTIONALLY BLANK ...
Page 95: ...END 2021 TEMPTEK INC RE 20210323 ...
Page 96: ......