MAINTENANCE
3Ć3
1465/1480/1490 MM185 (9–90)
RECOMMENDED FIRST 50-HOUR MACHINE INSPECTION
After the first 50 hours of operation, the following
procedures are recommended:
1. Check the squeegee deflection.
2. Check the specific gravity of the batteries.
3. Check the battery cable connections.
4. Check the scrub head side skirts
adjustment.
5. Check the tire pressure in the drive wheel
tires.
Summary of Contents for 1465
Page 1: ...1465 1480 1490 MM185 Rev 11 9 94 ...
Page 10: ...SPECIFICATIONS 1465 1485 1490 MM185 9 90 1Ć2 ...
Page 18: ...OPERATION 1465 1480 1490 MM185 9 90 2 2 ...
Page 42: ...MAINTENANCE 1465 1480 1490 MM185 9 90 3Ć2 ...
Page 49: ...MAINTENANCE 3Ć9 1465 1480 1490MM185 11 92 05097 ELECTRICAL SCHEMATIC ...