OPERATION
2-11
235E MM165 (3--91)
TO DUMP HOPPER
1. Push the main brush lever into the “UP”
position.
2. Pull the side brush lever into the “Raised”
position.
3. Move the vacuum lever to the “Filter Shaker”
position for 20 seconds to shake the dust
filter.
4. Slowly drive the machine up to the dump
site or dumpster.
5. Press and hold the hopper door switch in the
“CLOSE”position.
6. Pull the side brush and hopper lever to the
“LIFT”position, then into the “HOLD”
position when the hopper reaches the
desired dump height.
7. Press and hold the hopper door switch in the
“OPEN”position to dump the hopper.
8. Press and hold the hopper door switch in the
“CLOSE”position to close the hopper door.
9. Slowly back the machine away from the
dump site or dumpster.
10. Push the side brush and hopper lever to the
“LOWER”position to lower the hopper.
11. Press and hold the hopper door switch in the
“OPEN”position to open the hopper door.
POST OPERATION CHECKLIST -- MOTOR
OPERATING
Check the brush patterns for width and evenness.
TO STOP MACHINE
1. Return the directional pedal to the “neutral”
position. Apply the brake.
2. Push the main brush lever into the “UP”
position.
3. Pull the side brush lever back into the
“Raised”position.
4. Pull the side brush and hopper lever into the
“LOWER”position to stop the side brush.
5. Place the accessory switch in the “OFF”
position.
6. Set the machine parking brake.
7. Turn the key-operated on-off switch key to
the “OFF”position. Remove the key from
the switch.
FOR SAFETY: Before Leaving Or Servicing
Machine; Stop On Level Surface, Set Parking
Brake, Turn Off Machine And Remove Key.
POST OPERATION CHECKLIST -- MOTOR
STOPPED
Check the skirts for damage, wear, and
adjustment.
Check for wire or string tangled on the brushes.
Check for leaks.
Summary of Contents for 235E
Page 1: ...235E MM165 Operator Manual ...
Page 6: ...ABOUT THIS MANUAL 235E MM165 3 91 d ...
Page 14: ...SPECIFICATIONS 235E MM165 3 91 1 2 ...
Page 18: ...OPERATION 235E MM165 3 91 2 2 ...
Page 34: ...MAINTENANCE 235E MM165 3 91 3 2 ...
Page 42: ...MAINTENANCE 235E MM165 3 94 3 10 03380 HYDRAULIC SCHEMATIC ...
Page 70: ...MAINTENANCE 235E MM165 3 94 3 38 ...
Page 72: ...APPENDIX 235E MM165 3 91 4 2 ...