OPERATION
45
810 Gas/LPG 330160 (3--07)
EMPTYING THE HOPPER
1. Slowly drive the machine to the debris site
or debris container.
2. Pull and hold the hopper lift lever in the
Up
position and raise the hopper to the desired
height.
FOR SAFETY: When using machine,
make sure adequate clearance is
available before raising hopper.
NOTE: Be aware that the minimum ceiling height
needed to high dump the hopper is 3355 mm
(11 ft).
3. Release the hopper lift lever up and into the
middle (Hold) position.
4. Drive the machine up to the debris
container.
FOR SAFETY: When using machine,
move machine with care when hopper is
raised.
5. Pull and hold the hopper rollout lever into the
Out
position.
6. Lower the hopper into the debris container to
control dust.
351081
08480
08481
08477