Page 4 of 16
KIT NO. 9014094
9014108 Rev. 01 (11- 2017)
Tennant Company
www.tennantco.com
2. Continue routing the main harness connector, ec-H2O
pump connector and capacitor plug (A, B, C) through
frame grommet as shown (Figure 16).
Fig. 16
3. Locate the factory installed plug connector wire- tired
to machine harness as shown. Cut wire- tie and
connect the main harness connector (B) into machine
harness (Figure 17). Secure with wire-tie.
Fig. 17
4. Using two M8x1.25x20 hex sems screws, connect the
ec-H2O pump assembly to machine frame as shown
(Figure 18).
ec-H2O Pump
Assembly
Screw (2)
[1020341]
Fig. 18
5. Connect the ec-H2O wire harness pump connector to
pump (Figure 19). Connect the capacitor plug into
ec-H2O harness connector ( C
.
Capacitor
Plug
[1040868]
Fig. 19
6. Cut end of solution hose to remove hose plug. Using
clamp, connect solution hose to pump as shown
(Figure 20).
Clamp
[54333]
Cut off
hose plug
Fig. 20
7. Install grommet into machine frame and route the
solution hose from pump up through grommet (Figure
21). Make sure the arrow located on the check valve
points towards the grommet.
Grommet
[10632- 13]
ec-H2O
Pump Hose
Fig. 21
8. Carefully stand machine upright.