background image

Step 1

3

The hexagon pavilion is packaged into five metal shipping containers.  Two 
contain metal legs and shoulder pieces, two contain counters and 1 contains 
wall panels.  Remove all pieces from these containers and set them aside.

Step 2

Start by opening the leg so it forms a 90-degree angle.

Step 3

Lock this angle into place by rotating the angle bracket up and lining its holes 
up with the holes in the shoulder piece.  Insert the pin into the holes to secure 
it.   Repeat steps 2 and 3 for the remaining five leg pieces.

Step 4

Locate the middle star bracket.  Install the grey peak liner into the top of the 
peak pole (the peak pole extends out of the top of the star bracket).

HEXAGON PAVILION

Summary of Contents for HEXAGON PAVILION

Page 1: ...SETUP INSTRUCTIONS HEXAGON PAVILION...

Page 2: ...h that any overhead powerlines are duly noted and avoided during the tent erection process THANK YOU FOR YOUR PURCHASE TentCraft Inc in no way represents the estimated holding power to be true in all...

Page 3: ...opening the leg so it forms a 90 degree angle Step 3 Lock this angle into place by rotating the angle bracket up and lining its holes up with the holes in the shoulder piece Insert the pin into the h...

Page 4: ...tom of the legs Have someone hold it in place Step 7 A second person will pick up remaining legs and install them one at a time using the process explained in step 5 Once all legs are installed the st...

Page 5: ...om of the leg into the hole found on the inside edge of the wall panel Repeat this step for the opposite side of the wall panel Step 11 Attach the remaining ve wall panels using steps 9 and 10 It may...

Page 6: ...om underneath the counters at each leg take the remaining pin and slide it through the counter support and metal counter tabs to secure both counters to the counter support Repeat this step at the rem...

Page 7: ...the pocket on the inside of the roof over the small metal tab on the shoulder piece This attaches the roof to all six shoulder pieces Step 19 Extend the arms of each shoulder piece to pull the canopy...

Page 8: ...Step 21 8 While holding the peak pole in place insert the remaining pin through the hole in the pole to secure it in the extended position HEXAGON PAVILION...

Reviews: