KRB-5200h
Table of Contents
1. OUTER VIEW ......................................................................................................................................... 1
2. RECEIVING AND HANDLING ................................................................................................................... 2
2.1 Unpacking Precautions ................................................................................................................... 2
2.2 Transportation Precautions ............................................................................................................. 2
2.3 Storage Precautions ....................................................................................................................... 2
3. INSTALLATION ....................................................................................................................................... 4
3.1 Installing Rear-Connected ACB ...................................................................................................... 4
3.2 Installing Plug-in ACB ..................................................................................................................... 6
3.3 Connection and Specifications of Accessories ............................................................................... 9
3.3.1 Undervoltage Trip Device (UVT) .............................................................................................. 9
3.3.2 Shunt Trip Device (SHT) ........................................................................................................ 10
3.3.3 Auxiliary Switch (AX) and Alarm Switch (AL)......................................................................... 11
3.3.4 Motor Operator ....................................................................................................................... 12
4. OPERATION ......................................................................................................................................... 13
4.1 Direct-Manual Operation ............................................................................................................... 13
4.2 External-Manual Operation ........................................................................................................... 15
4.3 Motorized Operation ..................................................................................................................... 17
4.3.1 Motorized Operator ................................................................................................................... 17
4.3.2 Manual Operation ..................................................................................................................... 19
5. OVERCURRENT TRIP DEVICE ............................................................................................................. 20
5.1 Setting Change ............................................................................................................................. 20
5.2 OCR Field Tests ........................................................................................................................... 21
5.2.1 Tests with Current Applied to the Main Circuit ...................................................................... 21
5.2.2 Tests with Current Applied to the OCR Test Terminal .......................................................... 23
5.2.3 Tests Using OCR Checker (type ANS1) ................................................................................ 25
5.3 Operation Characteristic Curves ................................................................................................... 26
6. PRECAUTIONS ON TEMPERATURE-RISE TEST ................................................................................... 27
7. PRECAUTIONS ON INSULATION RESISTANCE TEST AND DIELECTRIC WITHSTAND VOLTAGE TEST . 27
7.1 Insulation Resistance Measurement............................................................................................. 27
7.2 Dielectric Withstand Voltage Test ................................................................................................. 27
7.2.1 Main Circuit ............................................................................................................................ 27
7.2.2 Auxiliary and Control Circuits ................................................................................................. 27
8. MAINTENANCE AND INSPECTION ........................................................................................................ 28
8.1 Guideline of Inspection Interval .................................................................................................... 28
8.2 Inspection Procedures .................................................................................................................. 29
9. TROUBLESHOOTING ........................................................................................................................... 31
Summary of Contents for AME Series
Page 2: ...KRB 5200h ...
Page 6: ......
Page 32: ...KRB 5200h 26 5 3 Operation Characteristic Curves ...
Page 39: ...KRB 5200f ...