March 2022
Service Manual
Scheduled Maintenance Procedures
Part No. 1312899GT
GR
™
-20J • GR
™
-26J
9
Secti on 3
Schedule d M ainte nanc e Proc edu res
Intro ductio n
Observe and Obey:
Maintenance inspections shall be completed
by a person trained and qualified on the
maintenance of this machine.
Scheduled maintenance inspections shall be
completed daily, quarterly, semi-annually,
annually and every 2 years as specified of the
Maintenance inspection Report
. The frequency
and extent of periodic examinations and tests
may also depend on national regulations.
Failure to perform each
procedure as presented and
scheduled may cause death,
serious injury or substantial
damage.
Immediately tag and remove from service a
damaged or malfunctioning machine.
Repair any machine damage or malfunction
before operating the machine.
Use only Genie approved replacement parts.
Machines that have been out of service for a
period longer than 3 months must complete
the quarterly inspection.
Machine Configuration:
Unless otherwise specified, perform each
procedure with the machine in the following
configuration:
•
Machine parked on a firm, level surface
•
Key switch in the off position with the key
removed
•
The red Emergency Stop button in the off
position at both the ground and platform
controls
•
Wheels chocked
•
All external AC power supply disconnected
from the machine
•
Platform in the stowed position
Summary of Contents for Genie GR-20J
Page 77: ...March 2022 Service Manual Function Manifold Part No 1312899GT GR 20J GR 26J 65 ...
Page 113: ...March 2022 Service Manual 101 Electrica l Schemati cs Electrical Schematic GRJ from GRJL 2298 ...
Page 116: ...Service Manual March 2022 104 Electrical Schematic GRJ from GRJL 2298 ...
Page 117: ...March 2022 Service Manual 105 GCON LED Panel GRJ from GRJL 2298 ...
Page 120: ...Service Manual March 2022 108 Temperature Sensor Harness GRJ from GRJL 2298 ...
Page 121: ...March 2022 Service Manual 109 Options GRJ from GRJL 2298 ...
Page 127: ......