May 2015
Service Manual
Checklist C Procedures
Part No. 1257106
GS-2669 BE • GS-3369 BE • GS-4069 BE
37
8 Lower the platform onto the safety arm.
9 Turn the key switch to the off position.
10 Securely install the limit switch to the lower
slider channel.
11 Turn the key switch to ground control and fully
raise the platform.
Result: The platform should stop raising at
maximum height. An alarm should not sound.
Result: The platform does not raise to
maximum height OR an alarm sounds. Refer
to Repair Procedure,
How to Calibrate the
Platform Overload System (if equipped)
.
12 Lower the platform enough to return the safety
arm to the stowed position.
13 Lower the platform to the stowed position.
C-2
Down Limit Switch Descent Delay
(if equipped)
Genie specifications require that this procedure be
performed every 500 hours or six months,
whichever comes first.
Application of lubrication to the platform overload
mechanism is essential to safe machine operation.
Continued use of an improperly greased platform
overload mechanism could result in the system not
sensing an overloaded platform condition and will
result in component damage.
Check the Down Limit Switch R ocker Arm Orientati on (if equipped)
Check the Down Limit Switch
Rocker Arm Orientation (if
equipped)
1 Turn the key switch to ground control and pull
out the red Emergency Stop button to the on
position at both ground and platform controls.
2 Raise the platform approximately 16 ft / 5 m.
3 Push in the red Emergency Stop button to the
off position.
4 Verify the limit switch rocker arms are adjusted
30° from the vertical position.
Summary of Contents for Genie GS-2669 BE
Page 1: ...Service Manual GS 2669 BE GS 3369 BE GS 4069 BE Part No 1257106 Rev A3 May 2015...
Page 27: ...May 2015 Service Manual Specifications Part No 1257106 GS 2669 BE GS 3369 BE GS 4069 BE 11...
Page 100: ...Service Manual May 2015 Manifolds 84 GS 2669 BE GS 3369 BE GS 4069 BE Part No 1257106...
Page 173: ...May 2015 Service Manual 157 Contactor Box Layout All Models...
Page 176: ...Service Manual May 2015 160 Ground Control Box Layout All Models...
Page 177: ...May 2015 Service Manual 161 Platform Control Box Layout All Models...
Page 180: ...Service Manual May 2015 164 Generator Wiring Diagram All Models...
Page 185: ...May 2015 Service Manual 169 Electrical Schematic GS 4069 BE with 2 Speed Lift ANSI CSA...
Page 188: ...Service Manual May 2015 172 Electrical Schematic GS 4069 BE with Proportional Lift ANSI CSA...
Page 193: ...May 2015 Service Manual 177 Electrical Schematic GS 4069 BE with 2 Speed Lift AS CE...
Page 196: ...Service Manual May 2015 180 Electrical Schematic GS 4069 BE with Proportional Lift AS CE...
Page 197: ...May 2015 Service Manual 181 Hydraulic Schematic GS 2669 BE and GS 3369 BE with 2 Speed Lift...
Page 201: ...May 2015 Service Manual 185 Hydraulic Schematic GS 4069 BE with 2 Speed Lift...
Page 205: ......