Operator's Manual
Third Edition • First Printing
Inspections
26
GS
™
-
2669RT • GS
™
-
3369RT • GS
™
-4069RT
Part No. 1305657GT
Pre-operation Inspection
Be sure that the operator’s, safety, and
responsibilities manuals are complete, legible
and in the storage container located in the
platform.
Be sure that all decals are legible and in place.
See Inspections section.
Check for hydraulic oil leaks and proper oil level.
Add oil if needed. See Maintenance section.
Check for battery fluid leaks and proper fluid
level. Add distilled water if needed. See
Maintenance section.
Check for engine oil leaks and proper oil level.
Add oil if needed. See Maintenance section.
Check for engine coolant leaks and proper level
of coolant. Add coolant if needed. See
Maintenance section.
Check the following components or areas for
damage, improperly installed, or missing parts and
unauthorized modifications:
Electrical components, wiring, and
electrical cables
Hydraulic hoses, fittings, cylinders, and
manifolds
Drive motors
Wear pads
Tires and wheels
Limit switches, angle sensor, alarms and
horn
Alarms and beacons (if equipped)
Nuts, bolts and other fasteners
Brake release components
Safety arm
Platform extension
Scissor pins and retaining fasteners
Platform control joystick
Outrigger housing and footpads (if
equipped)
Fuel and hydraulic tanks
Engine and related components
Platform entry gate
Generator (if equipped)
Check entire machine for:
Cracks in welds or structural components
Dents or damage to machine
Excessive rust, corrosion or oxidation
Verify that all structural and other critical
components are present and all associated
fasteners and pins are in place and properly
tightened.
Be sure side rails are installed and bolts are
fastened.
Note: If the platform must be raised to inspect the
machine, make sure the safety arm is in place. See
Operating Instructions section.
Summary of Contents for Genie GS-2669RT
Page 56: ......