Pre-operation Inspection
Be sure that the operator’s, safety and
responsibilities manuals are complete, legible
and in the storage container located in the
platform.
Be sure that all decals are legible and in place.
See Inspections section.
Check for engine oil leaks and proper fluid level.
Add oil if needed. See Maintenance section.
Check for hydraulic oil leaks and proper oil level.
Add oil if needed. See Maintenance section.
Check for battery fluid leaks and proper fluid
level. Add distilled water if needed. See
Maintenance section.
Check the following components or areas for
damage, improperly installed, or missing parts and
unauthorized modifications:
Electrical components, wiring, and
electrical cables
Hydraulic power unit, reservoir, hoses,
fittings, cylinders and manifolds
Generator and related components
Fuel and hydraulic tanks
Drive motors
Wear pads
Tires and wheels
Engine and related components
Limit switches, angle sensor, alarms and
horn
Lanyard anchorage points
Alarms and beacons (if equipped)
Nuts, bolts and other fasteners
Brake release components
Safety arm
Platform extension
Scissor pins and retaining fasteners
Platform control joystick
Outrigger housing and footpads (if
equipped)
Battery pack and connections
Ground strap
Platform entry gate
Check entire machine for:
Cracks in welds or structural components
Dents or damage to machine
Excessive rust, corrosion or oxidation
Verify that all structural and other critical
components are present and all associated
fasteners and pins are in place and properly
tightened.
Be sure side rails are installed and bolts are
fastened.
Note: If the platform must be raised to inspect the
machine, make sure the safety arm is in place. See
Operating Instructions section.
Summary of Contents for Genie GS-3369BE
Page 58: ......