April 2019
First Edition - Fourth Printing
Part No.
57.0009.0729
GTH-4014 AU, GTH-4018 AU
63
Transport and Lifting Instructions
Observe and Obey:
Genie provides this securement information as a
recommendation. Drivers are solely responsible
for making sure machines are properly secured
and the correct trailer is selected pursuant to
localized regulations, and their company policy
Genie customers needing to containerize any
lift or Genie product should source a qualified
freight forwarder with expertise in preparing,
loading and securing construction and lifting
equipment for international shipment.
Only qualified operators should move the
machine on or off the truck.
The transport vehicle must be parked on a level
surface.
The transport vehicle must be secured to
prevent rolling while the machine is being
loaded.
Before loading for transport, make sure the
deck, ramps and machine tires are free of mud,
snow and ice. Failure to do so could cause the
machine to slide.
Be sure the vehicle capacity, loading surfaces
and chains or straps are sufficient to withstand
the machine weight. Genie telehandlers are
very heavy relative to their size. See the
serial label for the machine weight. See the
Inspections section for the serial label location.