September 2016
Service and Repair Manual
Platform Components
Part No. 1268528
Z-40/23N, Z-40/23N RJ
25
Determine the limit switch trigger point:
5 Gently move the platform up and down by
hand, so it bounces approximately 1 to
2 inches / 2.5 to 5 cm. Allow the platform to
settle.
Result:
The overload indicator light and the
alarm is on.
Slowly tighten the load spring
adjustment nut by turning it clockwise just until
the overload indicator light and alarm turns off.
Note: The platform will need to be moved up and
down and allowed to settle between adjustments.
Note: There may be an approximate 2 second
delay before the overload indicator light turns on
and the alarm sounds.
Result:
The overload indicator light and
alarm is off.
Slowly loosen the load spring
adjustment nut by turning it counterclockwise
just until the overload indicator light and alarm
turn on.
Note: There may be an approximate 2 second
delay before the overload indicator light turns on
and the alarm sounds.
Note: The platform will need to be moved up and
down and allowed to settle between adjustments.
Confirm the setting:
6 Turn the key switch to platform control.
7 Lift the test weight off the platform floor using a
suitable lifting device.
8 Place the test weight back onto the center of
the platform floor using a suitable lifting
device.
Result: The alarm should be off. The platform
overload indicator light should be off at both
the ground and platform controls.
Note: There may be an approximate 2 second
delay before the overload indicator light and alarm
turn off.
9 Add an additional 10 lb / 4.5 kg test weight to
the original test weight to overload the
platform.
Result: The alarm should sound. The platform
overload indicator light should be flashing at both
the ground and platform controls.
Note: There may be an approximate 2 second
delay before the overload indicator light turns on
and the alarm sounds.
10 Test all machine functions from the platform
controls.
Result: All platform control functions should not
operate.
11 Turn the key switch to ground control.
12 Test all machine functions from the ground
controls.
Result: All ground control functions should not
operate.
Note: If the platform overload system is not
operating properly, repeat steps 1 through 4.
Summary of Contents for Genie Z-40/23N
Page 63: ...September 2016 Service and Repair Manual Manifolds Part No 1268528 Z 40 23N Z 40 23N RJ 53 ...
Page 111: ...September 2016 Service and Repair Manual 101 Electrical Schematic Chassis ...
Page 114: ...Service and Repair Manual September 2016 104 Electrical Schematic Ground Controls ...
Page 115: ...September 2016 Service and Repair Manual 105 Electrical Schematic Platform Controls ...
Page 118: ...Service and Repair Manual September 2016 108 Ground Control Box Wiring Diagram ...
Page 119: ...September 2016 Service and Repair Manual 109 Platform Control Box Wiring Diagram ...
Page 122: ...Service and Repair Manual September 2016 112 Platform Control Box Wiring Diagram Options ...
Page 123: ...September 2016 Service and Repair Manual 113 Hydraulic Schematic ...
Page 125: ......