Service and Repair Manual
September 2016
Primary Boom Components
34
Z-40/23N, Z-40/23N RJ
Part No. 1268528
How to R epair the Primary Boom C abl e Tr ack
How to Repair the Primary Boom
Cable Track
Component damage hazard.
The boom cable track can be
damaged if it is twisted.
Note: A 7 link repair section of cable track is
available through the Genie Service Parts
Department.
1 link separation point
2 lower clip
1 Use a slotted screwdriver to pry down on the
lower clip.
2 To remove a single link, open the lower clip
and then use a screw driver to pry the link to
the side.
3 Repeat steps 1 and 2 for each link.
How to Shim the Primary Boom
1 Extend the boom until the wear pads are
accessible.
2 Loosen the wear pad mounting fasteners.
3 Install the new shims under the wear pad to
obtain zero clearance and zero drag.
4 Tighten the mounting fasteners.
5 Extend and retract the boom through an entire
cycle. Check for tight spots that could cause
scraping or binding.
Note: Always maintain squareness between the
outer and inner boom tubes.
Summary of Contents for Genie Z-40/23N
Page 63: ...September 2016 Service and Repair Manual Manifolds Part No 1268528 Z 40 23N Z 40 23N RJ 53 ...
Page 111: ...September 2016 Service and Repair Manual 101 Electrical Schematic Chassis ...
Page 114: ...Service and Repair Manual September 2016 104 Electrical Schematic Ground Controls ...
Page 115: ...September 2016 Service and Repair Manual 105 Electrical Schematic Platform Controls ...
Page 118: ...Service and Repair Manual September 2016 108 Ground Control Box Wiring Diagram ...
Page 119: ...September 2016 Service and Repair Manual 109 Platform Control Box Wiring Diagram ...
Page 122: ...Service and Repair Manual September 2016 112 Platform Control Box Wiring Diagram Options ...
Page 123: ...September 2016 Service and Repair Manual 113 Hydraulic Schematic ...
Page 125: ......