September 2017
Part No. 57.4400.9219
GTH-1256 AF
3-7
Section 3 • Scheduled Maintenance Procedures
CHECKLIST A PROCEDURES
A-2
Perform Pre-operation
Inspection
Genie speci
fi
cations require that this procedure
be performed every 8 hours or daily, whichever
comes
fi
rst.
Completing a Pre-operation Inspection is essential
to safe machine operation. The Pre-operation
Inspection is a visual inspection performed by the
operator prior to each work shift. The inspection
is designed to discover if anything is apparently
wrong with a machine before the operator
performs the function tests. The Pre-operation
Inspection also serves to determine if routine
maintenance procedures are required.
Complete information to perform this procedure is
available in the appropriate operator's manual.
Refer to the Operator's Manual on your machine.
A-3
Perform Function Tests
Genie speci
fi
cations require that this procedure
be performed every 8 hours or daily, whichever
comes
fi
rst.
Completing the function tests is essential to safe
machine operation. Function tests are designed
to discover any malfunctions before the machine
is put into service. A malfunctioning machine must
never be used. If malfunctions are discovered,
the machine must be tagged and removed from
service.
Complete information to perform this procedure is
available in the appropriate operator's manual.
Refer to the Operator's Manual on your machine.