3-20
GTH-1256 AF
Part No. 57.4400.9219
September 2017
Section 3 • Scheduled Maintenance Procedures
Checklist C Procedures
C-1
Perform Engine Maintenance
Note: Engine speci
fi
cations require that this
procedure be performed initial 500 hours.
Engine valve lash - check
Required maintenance procedures and additional
engine information are available in the
Perkins 1104D-E44TA Operation and Maintenance
Manual
(Perkins part number SEBU9066-00).
Perkins 1104D-E44TA Operation and Maintenance
Manual
Genie part number
57.4700.0029
C-2
Perform Engine Maintenance
Note: Engine speci
fi
cations require that this
procedure be performed every 500 hours.
Fan clearance - check
Required maintenance procedures and additional
engine information are available in the
Perkins 1104D-E44TA Operation and Maintenance
Manual
(Perkins part number SEBU9066-00).
Perkins 1104D-E44TA Operation and Maintenance
Manual
Genie part number
57.4700.0029