Recovery and Transport
6
TC29
49
6 Recovery and Transport of the Machine
6.1 Recovery of the machine
The recovery of the machine should be
done by use of a crane if possible.
If the machine has to be towed for recovery, the
following tow fixing points are present:
•
eye (33/1) on the undercarriage
•
two drill holes (33/2) on the dozer blade
6.2 Loading the machine by use of a crane
Only use the original Terex crane lifting
harness!
Use a crane with sufficient weight-lifting
capacity of at least 3,000 kg.
To load the excavator onto a flat bed trailer, etc.,
the following activities must be carried out:
•
Empty and fold in the bucket.
•
Position the work equipment straight ahead.
•
Raise the boom until the height specified.
•
Retract the dipperstick.
•
Stop the engine.
•
Dismount from the excavator and close the
doors.
•
Suspend the excavator expertly on the points
marked using the 3-point crane lifting harness.
Take care that the spreader bar (34/1) is
correctly seated.
HR1433
1
2
2
2
Fig. 33-Tow fixing points
HR14-03-34
1
1
ca
.31
0
ca.1300
Fig. 34- Crane suspension
Summary of Contents for TC29
Page 6: ...Table of Contents TC29...
Page 22: ...3 Technical Data TC29 16 Views with canopy Fig 5 Views with canopy...
Page 34: ...3 Technical Data TC29 28...
Page 90: ...8 Operating Problems TC29 84...
Page 94: ...9 Appendix TC29 88...