14
For installation of the model «Vitra» on the site of
operation it is necessary:
1.
Unscrew self-tappers 8 ps. that fixes a door with a
frame to a fuel channel and remove a door; (see
Figure 5)
2.
Install the stove on the site of operation (edge of a
fuel channel shall emerge from another side of a
baffle);
3.
Install back a door with a frame. I will be fixed by
self-tappers.
Figure 5. Door disassembling under
installation of the stove «Vitra»
a metal plate on a heat-insulation
material (an asbestos paper with
thickness 10 mm)
wood (inflammable material)
a thermal insulation of a
nonflammable material
(haydite/dross/ basalt wool)
bricks and so on (a nonflammable
material)
a material of foundation
(nonflammable)
1.
A sheet in front of a combustor
2.
A flue cover
3.
Flue with a thermal insulation of
type «sandwich construction»
4.
An overlap of a nonflammable
material for a roof
5.
A roof splicing
6.
A hole for used air exhaust
7.
Adjustable latches
8.
A vertical box
9.
A hole for fresh air intake
10.
Start-sandwich
Figure 6. Installation of the stove in
inflammable material premise