background image

3

Summary of Contents for Temy Plus P 20

Page 1: ... 20 Residential cooker for solid fuels according EN 12815 Technical User Manual Customer service Termomont d o o Prhovačka bb 22310 Šimanovci tel 022 480404 022 480494 fax 022 480494 www termomont rs April 21 2016 ...

Page 2: ...ystem 9 5 1 Filling the system with water 9 5 2 Connecting the boiler with a closed central heating system 10 5 2 1 Installation method 1 10 5 2 2 Installation method 2 11 5 3 Use of temperature relief valve with obligatory filling 12 5 4 Fitting the boiler to an open central heating system 12 6 Boiler operation 13 7 Chimney 14 8 Modes of Operation 15 8 1 Predominantly Heating or Baking Mode 15 8 ...

Page 3: ...1 Technical data 2 ...

Page 4: ...3 ...

Page 5: ...Overal height 890 mm Overall length 705 mm Necessary draught 14 Pa Flow 1 Return 1 Weight 310 kg Flue opening 148 mm Water content 22 lit Chamber volume 36 dm3 Max working pressure 3 bar Dimensions of the oven 350x230x405 mm Flue gas temperature 212 C Efficiency 80 56 CO Emissions 13 O2 0 0929 TOC OGC 17 64 mg m3 Dust 27 91 mg m3 4 ...

Page 6: ...second water oven 11 handle of chimney flap 12 oven door with thermostat 13 Cover for cleaning stove 14 Box for wood 15 Chimney upper 16 cooking plate 17 Decorative iron cast 18 Decorativ rod 19 Rod for fire place grid 20 flow return 21 Changer 22 Probe 23 Filling Emptying 24 Tercial air 25 Thermoregulator 26 open for chimney on back side of boiler 27 Open for chimney on back housing plate 28 Hous...

Page 7: ...e doors and the frame of the cooking plate is made of cast iron Heating chamber is made of 5mm thick steel plates The upper door and the oven door are cast iron made and have a window made of fireproof glass The flue opening is placed both on the upper side and on the back side of the boiler so the customer can chose which one to use and which one to close The oven are made of stainless steel AISI...

Page 8: ...nt side of the boiler Secondary air is adjusted at the main combustion chamber door Finally tertiary air holes are located ath the back wall of the heating chamber cannot be adjusted Exit flue gas flap control On the right hand side beside the oven there is another flap handle located Moving this handle back and forth it is possible to control the flue gas opening area and also to adjust the wheth...

Page 9: ...ity in the storing room also must not exceed the critical value of 80 so as not to create any condensate The temperature of the storing room must be in the range from 0 C to 40 C When unpacking the boiler you must check whether the paint on the boiler coating has been scratched somewhere and whether all parts of the boiler stand in their proper position 2 2 Delivery range Together with the boiler ...

Page 10: ... the responsibility and guarantee the correct operation of the boiler and of the complete central heating system In the case of an incorrectly planned system with manifesting deficiencies caused by the respective person s incorrect installation of the system which can again lead to an incorrect operation of the boiler the complete liability for the material damage and potential new costs arising i...

Page 11: ...tioned and mounted close to the boiler It must be easily identifiable and allow for easy access The safety pressure valve must be set to a nominal pressure of 2 5 bar The valve must open and operate smoothly at 2 5 bar Diameter for the aperture at the seat of the valve must be at least 15mm Connecting pipework to the boiler must be as short as possible Welds joints or any possible blockage to this...

Page 12: ...c air vent 2 Safety valve 3 Circulation pump separated with ball valves on each side so that it can be easily replaced if necessary Expansion vessel is on the RETURN line in this case Expansion vessel and safety valve are connected following the rules described in the previous chapters For safe operation info on additional equipment such as expansion vessel and safety valve please refer to manuals...

Page 13: ... system The connecting scheme of an open central heating system is depicted on the figure When using open system on the FLOW line following elements are to be installed safety pipework for the open expansion vessel boiler valve On the RETURN line come safety return line of the open expansion vessel boiler valve and circulation pump valves Open expansion vessel is connected to the hot water distrib...

Page 14: ... on the top When the fire begins to burn draught regulator is set on desired temperature position 2 Heating from below put small amount of solid fuel over the fireplace pipes grid no ash should be present and set up a fire The draught regulator is at the maximum position When the fire begins to burn add larger amount of fuel and set draught regulator on desired temperature position Make sure that ...

Page 15: ...blocked or the circulation pump is defect stop the boiler operation first only when the boiler is cold reparation action can be undertaken 7 Chimney The purpose of the chimney is to take out the products of combustion but also to secure necessary air draught in the boiler The purpose of this chapter is only to provide basic information Please consult your chimney supplier for details We take no re...

Page 16: ...antly Heating Mode hot gases are directed to the hot water inside the boiler The flap handle Position 4 is in its maximum position towards the boiler flap is closed At the same time the setting wheel Position 4 is to be set on Position 2 as shown in the image above 8 2 Winter or Summer Mode When outpacking the boiler please find a screwing bar Letter D behind the lower door This bar enables the su...

Page 17: ...n valve such as Danfoss BVTS Caleffi or Watts If the water temperature rises the valve will open and let cold water through the heat exchanger system thus quickly and efficiently lowering the temperature The valve will operate safely regardless of the ambient temperature and the self acting technology means that the valve does not recquire electricity or other forms of energy in order to work Desc...

Page 18: ... and is completely cold The use of gloves is obligatory It is recommended that the boiler is cleansed from ash once to two times weekly A detailed cleansing of the boiler should be done once a month and also when the heating season ends Regular maintenance extends the service life of the boiler Beside the heating chamber it is also necessary to clean the area below the oven To access this area ple...

Reviews: